U-05 / SIGNAL LOG — 001–016
THE LOG
Sixteen signals, five buildings, one rig. Every edition below was built and torn down in a single night. Traces are the editions' own — no two alike.
- 016Nyx Larsenwinter run — three rooms, concrete cold enough to see your breathARCHIVED
- 015Iron Lung Sound Systemreturn to the print works; LOWBOY stacked double for the b2b2bARCHIVED
- 014VOID.EXEsummer close-out; loading dock opened at 2am for the sunrise setARCHIVED
- 013Ferrofirst time in the substation hall — ceiling fans on for the whole setARCHIVED
- 012Kesslerback where it started; capacity halved by council conditions, sold anywayARCHIVED
- 011Depth Charge Collectivelive modular PA closed all three rooms in sequenceARCHIVED
- 010Static Lowtenth signal; the crew printed one run of shirts, never againARCHIVED
- 009Mono Staticfirst edition with the welfare SIGNAL desk running all nightARCHIVED
- 008Resonant Kidrain flooded the bay; rig lifted onto pallets, doors held 40 minutesARCHIVED
- 007Nyx Larsenfirst international booking; SMS drop system debutsARCHIVED
- 006Hex Rowambient room ran from doors to close for the first timeARCHIVED
- 005Ferrosingle room, single stack, no second stage — the purist editionARCHIVED
- 004Iron Lung Sound SystemTHE STACK named after the freight elevator shaft it filledARCHIVED
- 003VOID.EXEfirst sell-out; door list abolished permanently afterwardsARCHIVED
- 002Static LowLOWBOY rig v2 — the sub cabinets that still tour todayARCHIVED
- 001Kesslerfirst signal. 212 people, one room, one rule: no phones on the floorARCHIVED
Signals 2019–2021 ran unnumbered and undocumented — house parties, car parks, one rooftop. The log starts where the paperwork does.